NFC Laboratory Rates
wdt_ID | Resource | INTERNAL | EXTERNAL NON-PROFIT | EXTERNAL FOR-PROFIT |
---|---|---|---|---|
1 | Cleanroom access fee | $44.80 / month | $50.80 /month | $56.81 / month |
2 | Cleanroom use | $41.51 / hour | $62.27 / hour | $103.78 / hour |
3 | Startup fee | $214.20 | $291.31 | $535.50 |
4 | Custom processing by staff | $67.73 / hour | $98.32 / hour | $202.10 / hour |
6 | Training and staff support - Elionix GS-100 | $53.55 / hour | $98.32 / hour | $202.10 / hour |
7 | Chemicals (see list of provided materials) | $0.00 | $0.00 | $0.00 |
8 | Deposition materials (non precious - see list) | $0.00 | $0.00 | $0.00 |
9 | Photoresists and developers (see list) | $0.00 | $0.00 | $0.00 |
10 | Deposition material - gold | $88.89 / gram | $88.89 / gram | $88.89 / gram |
12 | Training on other tools | $0.00 | $0.00 | $0.00 |
13 | ||||
Resource | INTERNAL | EXTERNAL NON-PROFIT | EXTERNAL FOR-PROFIT |
NFC Tool Rates
wdt_ID | Resource | INTERNAL | ACADEMIC | INDUSTRIAL | TYPE | FOM name |
---|---|---|---|---|---|---|
1 | Al etch bench | $0.00 / hour | $0.00 / hour | $0.00 / hour | Subtractive | WET Al Etch Bench |
3 | BOE / HF bench | $0.00 / hour | $0.00 / hour | $0.00 / hour | Subtractive | WET BOE / HF Bench |
4 | Cooke vacuum annealer | $0.00 / hour | $0.00 / hour | $0.00 / hour | Thermal | PKG Cooke Vacuum Annealer |
5 | Corrosives bench | $0.00 / hour | $0.00 / hour | $0.00 / hour | Subtractive | CLAS Corrosives Bench |
6 | CVC sputter | $32.77 / hour | $50.25 / hour | $83.02 / hour | Additive | DEP CVC Sputter DEPOSIT |
7 | Denton sputter | $32.77 / hour | $50.25 / hour | $83.02 / hour | Additive | DEP Denton Sputter DEPOSIT |
8 | Diamond scribe | $0.00 / hour | $0.00 / hour | $0.00 / hour | Assembly | PKG Diamond Scribe |
9 | Disco Dicing Saw | $0.00 / hour | $0.00 / hour | $0.00 / hour | Assembly | PKG Disco Dicing Saw |
10 | Die attacher | $0.00 / hour | $0.00 / hour | $0.00 / hour | Assembly | PKG Die Attacher |
11 | Dielectric evaporator | $32.77 / hour | $50.25 / hour | $83.02 / hour | Additive | DEP Dielectric Evaporator DEPOSIT |
Resource | INTERNAL | ACADEMIC | INDUSTRIAL | TYPE | FOM name |
SOFT CAP STRUCTURE: All charges per internal user, for hourly and equipment fees up to $731.92, are billed at 100%. Charges paid by the PI, between $731.92 and $1,224, are billed at 20% (80% price reduction). All charges over $1,224 paid by the PI are billed at 5% of the full charge. Staff processing fees and any recharged materials fees (such as precious metals in the deposition tools) are not capped.
CLEANUP FEE: When members no longer need access to the NFC labs, they are expected to complete a short checkout procedure, which includes removing any materials they own from the lab. Failure to clean out your stuff when you leave the lab may incur a $200 cleanup fee if NFC staff have to take care of it for you.
STOPPING AND RESTARTING LAB ACCESS: Lab members who suspend or terminate their lab access and need to restart it will be charged the startup fee again.